Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

if the stopwatch can measure to the nearest tenth of a second, which skateboarder will show as having a different time from the others?
What is the perimeter of the rectangle with a length of 23 and a width of 16?
!10 POINTS I NEED AN ANSWER ASAP! When earth completes a full rotation. How much time has elapsed?
Who were the defendants at the nuremberg trials?
Please help! An astronaut must perform a repair at 30m outside her spaceship. It moves at a speed of 2m/minute. She took 20 minutes to complete the repair then
How to change a subtraction problem into an addition problem
Round each amount to the nearest hundred to find a reasonable estimate of 7245 – 5680.
On what basis are metamorphic rocks classified
Who is the one most likely to commit suicide high serotonin level?
All of the following are ways we constantly communicate to those around us except ______. a. intent b. gestures c. facial expressions d. postureAll of the follo