It take 4 people 40 minutes to clean a garden. How long will it take 6 people to clean the same garden

Respuesta :

loconte loconte
  • 02-07-2021

Answer:

4/9 of an hour (26.666 minutes)

Step-by-step explanation:

4 * x * 40/60 = 1

x * 160/60 = 1

x=60/160 = 6/16 = 3/8 (this is the rate for one worker)

~~~~~~~~~~~~~~~~

6 * (3/8) * x = 1

x = 4/9

Answer Link

Otras preguntas

What are the two ways to determine the negative leg of an LED?
How does interpreting secondary and primary sources help us look into the past?
What is the answer to 20=5x 10y?
Whats the evolution of the microscope in timeline
On a blueprint, the scale is 1/2 inch= 1 foot. What are the dimensions on the scale drawing for a room that is 22 feet by 17 feet? Then find the scale factor.
the first major city in sumer was _____. (babylon, ur, baghdad)
What is a product and how do you know you have to get a product?
1.describe north america's most pressing environment issue.
What is the difference between mass and weight
multiply 8.88 x 10to the 4