15 workers working 8hrs a day can complete a piece of work in 20 days. In how many days will 10 workers do it,working 6 hrs a day? please help!!

Respuesta :

ridmitharuka
ridmitharuka ridmitharuka
  • 02-08-2021

Answer:

40 days

Step-by-step explanation:

w1*h1*d1=w2*h2*d

15*8*20=10*6*d

2400=60d

d=2400/60

d=40

Answer Link

Otras preguntas

What is the type of tissue that consist of living cells surrounding by an extracellular matrix?
Factors like lack of variation and environmental changes can cause a species to fail to survive. This is known as A. conservation. B. evolution. C. extinctio
What is 7.3 billion divided by 7?
How is the sun related to neuclear electromagnetic and heat energy
Reid ate 1/4 if pie, joe ate 1/3 of pie. How much was left after they both ate their pieces
What effect does a rise in the cost of machinery or raw materials have on the cost of a good?
During the process of steel production, the flaws in steel casting are detected by a. ultrasonic vibrations. b. infrasonic vibrations. c. resonant vibrations. d
Conducting experiments, using inquiry, and asking testable questions are processes that are used by
What is the value of the 4 in 6.54
Number like 10,100,1000,and so on are called____