8 students take 18 hours to construct a raft.
If the raft needs to be completed 12 hours earlier, calculate how many more students are needed.

Respuesta :

devishri1977
devishri1977 devishri1977
  • 04-08-2021

Answer:

16

Step-by-step explanation:

Students                      8       x

Time taken (hours)     18     18 - 12 = 6

If number of students increases, the work will completed in less hours.

So inverse proportion

[tex]x =\frac{18*8}{6}=3*8 = 24[/tex]

Additional students required = 24 - 8 = 16

Answer Link

Otras preguntas

which element can become stable by losing 1 electron
System of equations x-y-2z=4, -x+2y+z=1, x+y-3z=11. Solve by elimination
if 120 marks is 60% what is full marks
11 times 4 and 1 3rds
results of 1+2+3+....+99+100+99+...+3+2+1 is.....
A basketball rolls of a 0.70 m high desk and strikes the floor 0.25 m away from the base of the desk? How fast was the ball rolling?
11 times 4 and 1 3rds
express each number in fraction form before finding the inverse:7,10,1 3/4,
The crew on fishing boat caught four fish weighing a total of 1092 pounds. The tarpon weighed twice as much as the amberjack and the white marlin weighed twice
1. Compare the location of electrons in an atom based on Bohr's theory with the location of electrons in an atom based on the current atomic theory. 2. Rutherf