elizabethmorladza
elizabethmorladza elizabethmorladza
  • 01-09-2021
  • Mathematics
contestada

A piece of work takes 20 labourers to complete in 10 days. how many labourers will complete the same job in 25 days if they work at the same rate?​

Respuesta :

denimjackets23
denimjackets23 denimjackets23
  • 04-09-2021

Step-by-step explanation:

If 20 labourers=10 days

x labourers = 25 days

10x= 25×20

[tex] \frac{10x}{10} = \frac{25 \times 20}{10}[/tex]

Cancelling out by 10 on both sides

[tex]x = \frac{25 \times 2}{1} \\ x = 50 [/tex]

Therefore, it takes 50 labourers to complete the work at the same rate in 25 days.

Answer Link

Otras preguntas

How many times dose 150 go into 1000
What is the velocity of an object that has a mass of 2.5 kilogram and a momentum of 1,000 kg·m/sec?
what is 54 times 3 times 71 minus 45 plus 102 divided by 6 times 25 subtracted by 34 times 141 plus 32 subtracted by 67? Also put 578402/10856 in simplest form.
During a recent winter, the ratio of deer to foxes was 7 to 3 in a town. If there was 210 foxes in the town, what was the number of deer in the town?
Write -90.85 as a mixed number in simplest form.
I have been stuck with this one, and i would like to how to solve this. In each case, determine whether line AB is parallel or perpendicular to CD. (a) A(0, 0),
Where and when did Martin Luther King Jr. die?
what is the difference between closed-end credit and open-end credit
help help help help!
How to find the area of a circle ?