hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

please help me Which example is a trace fossil? dinosaur footprint dinosaur bone dinosaur egg shark tooth
In the accompanying diagram of AABC, DE is parallel to BC. If AD = 3, DB = 6, and DE = 5, what is the length of BC?
63% of all people in the United States have at least some college education. If ten people were chosen at random, find the probability that exactly half have so
How does vera help her community?​
Paul Revere warned of the sneak British attack with his signal, "One if by land, two if by sea", before riding through the towns exclaiming, "The British are co
Between Mood or Tone, What is the difference
Heat from Earth’s interior and pressure from overlying rock transform the remains of marine sediments into _____.
V + Iwh I = 32, w = 14, and h = 7 V = ___ Options: A: 53 B: 3,136 C: 448 Please show your work
How can high-altitude training help athletes get more oxygen to their cells
According to the article, WHY did scientists suspect that climate change would affect Australia first?