It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

Respuesta :

Esther
Esther Esther
  • 03-03-2022

Answer:

20 days

Step-by-step explanation:

It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

12 * 5 = 60

60/3 = 20

It will take 3 men 20 days to do the same job

Answer Link

Otras preguntas

Need help with this math
Find the intersection point between the lines of equations:2x-y+6=0 and 2x+3y-6=0 ​
What would be the return on total assets of a firm if net income is $50,000, total sales are $100,000, and total assets are $175,000
The equivalent equation is found by distributing the 1 to get 4.
What is the value of cose in the diagram below?
What number is increased by 40% become 28?a.5 b. 10 c. 15 d. 20​
The first five terms of an arithmetic sequence are shown below: 20, 17, 14, 11, 8, . . . Let n represent the term number and f(n) the term in the sequence. Choo
With what tension must a rope with length 3.00 mm and mass 0.105 kgkg be stretched for transverse waves of frequency 40.0 HzHz to have a wavelength of 0.790 mm
Which text feature would best clarify the information in this part of Javier’s paper? an illustrated diagram of a samurai in full battle gear a chart showing th
To select a strategy in a two-person, zero-sum game, Player A follows a ________ procedure and Player B follows a ________ procedure.