brimccauley6658 brimccauley6658
  • 03-08-2022
  • Business
contestada

In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

If m = rxf, then what will be the value of m*r? A) r²x B) rf C) r²xf D) m
what was the most importnat result of the spanish american war
Find the slope of the line through each pair of points: (3,4) and (3,-4) m=?
simplify this provlem
What does The world war 1 have a chief
Janie's total trip to and from school is 0.68 of a mile. How far did she walk if she makes this trip 27 days last quarter?
Describe the roll of ATP in the muscle cell
the power of the federal government are
Given , find the quotient. (2 points) −14.6 1.825 −3.65 14.6
what are nutrients the Venus flytrap use and need