carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

Can being sick make your heart race?
how do I solve this 2(4x^3+9m+3x^2)
Does wind have atoms and molecules in it?
what is 21% of 30.00
Can drinking too much water be bad for you?
PLEASE HELP DESPERATE Renaissance painters were influenced by a shading technique known as chiaroscuro, first introduced by which of the following? A Byzantine
400 reduced by 3 times my age is 163. What is his age?
Which personal pronoun correctly completes the sentence? A flock of birds flew over __________. A. we B. his C. they D. them
18.2 18.45 18.6 18.76 I needed to order them smallest to largest did I do it right?
In recent years, people have been motivated to move from rural areas to urban areas for __________.