RoboticNaruto4693 RoboticNaruto4693
  • 03-01-2018
  • Physics
contestada

How much work is done when a hoist lifts a 290-kg rock to a height of 7 m?

Respuesta :

samuraijack
samuraijack samuraijack
  • 03-01-2018
Given: Mass m = 290 Kg;  Height  h = 7 m

Required: Work = ?

Formula: Work = Force x distance  but, Force F = mg

W= fd

W = mgh

W= (290 Kg)(9.8 m/s²)(7 m)

W = 19,894 Kg.m²/s²

W = 19,894  J




  
Answer Link

Otras preguntas

A positive problem may be viewed as a(n
Select which geologic events will have an immediate impact on the landscape. Choose three (3). Question 2 options: Earthquake Landslide Continental drift Meteor
If h= 13 units and r= 4 units, then what is the approximate volume of the cone shown above? A 208 cubic units В. 527 cubic units C. 225.337 cubic units D. 69.33
A steamboat tour makes a trip upstream 24 miles and back in total of 10 hours in a river with a current speed of 1mph. What is the speed of the steamboat in sti
How can you recognize and interpret associations in two-way tables?
PART C Dr. Price descends to Location D to observe shrimp. She then ascends and stops to observe sea life that is halfway between Location B and Location C What
please help with question 1
pls help me it's due today​
The lemonade recipe calls for 1 cup of lemon juice to 6 cups of water. How much lemon juice is needed for each cup of water?
Will give brainliest answer